Exciting images and progress... / by Scott Newland

Lots happening on the job site, thankfully.  Doors are going in, tile is progressing, hardwood floors are being nailed down, and the metal roof is being installed.  Tomorrow will see final grading and countertop installations.

This image shows the slats alongside the stairwell.  They are continuous from the basement through the top level, providing the code-mandated barrier while allowing peek-a-boo glimpses through it.

This image shows the slats alongside the stairwell.  They are continuous from the basement through the top level, providing the code-mandated barrier while allowing peek-a-boo glimpses through it.